In spring 2022 we shook hands with Open Dutch Fiber BV and unrolled, at the time, our largest building cluster, Hellevoetsluis. As a strategically important “lock” it imposed numerous construction challenges. After two years it has been completed, covering approximately 17.000 households.
Read MoreIn May 2023, following another mission for ODF, backed up with warm welcome from the municipality, our teams were unrolling the network in Oegstgeest. Under a keen eye of its residents and to everyone’s satisfaction, one year later, we successfully laid the fiber-optic network in this culturally and historically rich town.
Read MoreSpring of 2023, we took another challenging endeavor for our partner – Open Dutch Fiber. This time our task was to build the network in the Realm of a Thousand Islands. Through a good communication, we have built a modern base for communication to serve future generations. Optical signal, flickering under the streets of Broek op Langedijk is at disposal of 8 thousand households,
Read MoreAt the beginning of July 2022, the construction of an FTTH network began in Sint Pancras, a small town known for its distinctive architectural style of traditional houses, rich heritage, and well-maintained gardens. After just 2.5 months, this quiet town, a traditional Dutch rural community with 2,706 residents, was able to enjoy the benefits of modern technology with the fastest fiber optic internet.
Read MoreFor the needs of the KPN Netwerk, we are currently working on a FTTH project in the municipality of Haarlem - Houtvaartkwartier and Duinwijk, which will cover 13,252 users. More than 100,000 homes now have access to high-speed internet thanks to our efforts and the technology we use.
Read MoreIn 2022, our team was responsible for the design and construction of the FTTH project in Haarlem Schalkwijk. This ambitious project covered 15,166 users. The goal of the project was to provide fast, stable, and reliable internet that would meet the growing needs of the residents.
Read MoreThis highly challenging project, which involves numerous borings beneath major roads and waterways, aims to connect East Haarlem to the FTTH (Fiber To The Home) network. This will significantly enhance the quality of life and business operations in this modern part of the city. The plan is to cover 12,686 user addresses with a network spanning 92,000 meters
Read MoreKatwijk aan den Rijn en Valkenburg project is the 4th and final one in the municipality of Katwijk. This beautiful neighborhood, intersected by canals, posed a significant challenge for our company, with over 65 km of digging and numerous directional drillings beneath canals and paved streets.
Read MoreThe first project in the municipality of Pijnacker Nootdorp. During the 6 months of work on this project, we successfully connected 3,208 out of a total of 3,349 households, setting a record for both our company and KPN with approximately 96% of connections installed
Read MoreIn this ongoing project, which encompasses buildings primarily from the 16th, 17th, and 18th centuries and is rich with monumental structures, our employees have successfully connected over 8,100 addresses with the most modern FTTH (Fiber To The Home) network. From the preparatory and design phases to the execution of construction work and user connections, our team has built a route spanning 89,450 meters over a period of 16 months.
Read More