Harpex B.V. — progress report, first half of 2026

Reporting period: 1 January 2026 to 30 June 2026. The base year is 2025, a full calendar year of 244.27 tonnes CO2. A half year is not compared here as a percentage reduction against that full year.

Results

Scope 1: 966.47 tonnes CO2.
Scope 2: 5.83 tonnes CO2.
Total: 972.30 tonnes CO2.

Diesel, including own equipment: 160,493 litres, 521.76 tonnes.
Petrol, including own equipment: 151,972 litres, 424.61 tonnes.
Natural gas: 9,415.5 m3, 20.09 tonnes.
Electricity: 12,080 kWh of grey electricity, 5.83 tonnes.

Diesel and petrol are about 97% of this half-year footprint. Office gas is allocated from meter readings. Turnover for the first half of 2026 is not yet included, so the 2026 intensity target is not scored in this report. No CO2 reduction is claimed for this period.

Measures

The effort is aimed at fuel. Carpooling, route planning and keeping vehicles at the project site are in use. The litres saved are not yet measured. An HVO100 pilot is planned before 31 March 2027, covering 25% of suitable diesel in 2027 and 50% in 2028. Electric replacements are assessed when vehicles and equipment are due for replacement. Qualifying green electricity is planned by the end of 2027. Own generation of at least 2,860 kWh a year, with at least 70% used on site, is planned from the end of 2028.

The targets for 2026 to 2028 are on the CO2 Performance Ladder page. By the end of 2028 the aim is 9.31 tonnes CO2 per million euro of turnover, 29.5% under 2025, and 10% less final energy per million euro.